三峡工程永久船闸中隔墩岩体变形模拟研究

Study on the rock deformation of middle isolated pier of permanent ship lock in the Three Gorges Project
下载PDF
导出
摘要 运用离散单元法 (DEM )与有限单元法 (FEM )等数值模拟方法 ,全面地对长江三峡工程永久船闸二闸室至三闸首部分的中隔墩岩体分别在施工期和运行期的变形规律进行了模拟研究 .综合分析结果表明 :垂直于闸室轴线的水平位移在开挖完成后基本处于稳定状态 ,而在运行期有所减少 ;平行于闸室轴线的水平位移总体向下游发展 ;而垂直方向的位移先表现为回弹 。 The middle isolated pier (MIP) is one of the key structures of permanent shiplock of Three Gorges Project on Yangtze River, China. The study on rock mass deformation of middle isolated pier of the second shiplock under various operation conditions is made. The numerical simulations using 2 D distinct element method and 3 D finite element method are used to analyze rock mass deformation law. The comprehensive results can be summarized as follows: (1) the horizontal displacement vertical to axial line of shiplock varies with process of excavation, and is in steady state after excavation; during operation of shiplock, the displacement is slightly decreased; (2) the horizontal displacement parallel to axial line of shiplock is of tendency of developing to downstream; and (3) the vertical displacement has the property of resilient deformation occurring during excavation, and then of subsidence with slightly various values taking place in different part of the middle isolated pier in different operation conditions.
出处 《华北水利水电学院学报》 2002年第2期14-18,共5页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 三峡工程 永久船闸 中隔墩 岩体 变形 模拟 Three Gorges Project (TGP) middle isolated pier (MIP) simulation
  • 相关文献

参考文献3

二级参考文献4

共引文献178

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部