合山电厂3个机组主厂房定向爆破拆除 被引量:1

Directional Blasting of the Main Workshops of Guangxi Heshan Electricity Plant
下载PDF
导出
摘要 介绍了广西合山电厂 1# ~ 3# 机组主厂房定向爆破设计与施工。该工程不仅规模大、环境十分复杂、工期紧、难度高、风险性极强 ,最大特点是拆除发电设备与爆破同步进行施工。 The design and implementation of control led blasting of No.1~No.3 main workshops of Guanxi Heshan Electricity Plant is introduced.The project is in large scale ,with comp licated conditions and short time limit .The demolition of equipment of power-generation is implemented along with exploding ,which faces the strongest danger .The preparations for explosive implementation under the conditions of compound working is so peculiar as provide precious references for similar projects hereafter.
作者 张健 陆鹏程
出处 《爆破》 CSCD 2002年第2期84-86,共3页 Blasting
关键词 合山电厂 主厂房 定向爆破 爆破拆除 高框架结构 混合作业 爆破参数 demolition blasting high frame structure mixed working
  • 相关文献

参考文献5

二级参考文献8

  • 1何广沂.拆除爆破新技术[M].北京:中国铁道出版社,1998..
  • 2阎家良.结构物爆破[M].南京:工程兵工程学院出版社,1984.177.
  • 3何广沂,拆除爆破新技术,1998年
  • 4刘殿中,工程爆破实用手册,1999年,566页
  • 5阎家良,结构物爆破,1984年,177页
  • 6刘殿中,工程爆破实用手册,1999年
  • 7林学圣,控制爆破,1982年
  • 8范学臣,姜华,余信武,王小青.大型环体封闭楼群一次性爆破拆除技术[J].爆破,2000,17(1):20-23. 被引量:2

共引文献17

同被引文献5

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部