550kV变压器局放试验不合格原因分析及处理 被引量:1

Reason Analysis and Processing of 550kV Transformer Partial Discharge Test Unqualified
下载PDF
导出
摘要 阐述SFP-780 MVA/550 kV主变压器出厂局部放电试验不合格的基本情况,分析了现场局放交接试验过程中出现的问题,提出对550 kV变压器的绝缘处理和试验情况,需要综合放电波形和放电特性各个要素,结合试验分析推理,才能找到缺陷部位并确定局部放电量偏大的原因,对缺陷进行有效处理。同时提出改进建议。 Elaborated the basic situation of SFP- 780 MTV A / 550 kV main transformer factory partial discharge test unqualified,analyzed the problems that arose in the process of the site handover partial discharge test,put forward the 550 kV transformer insulation treatment and experiment situation,need comprehensive various of elements such as discharge waveform and discharge characteristics,combined with the experimental analysis and inference,to find the defect parts and to determine the reason of the larger partial discharge quantity,handling defect effectively.Meanwhile put forward suggestions for improvement.
出处 《安徽电力》 2014年第3期32-35,共4页 Anhui Electric Power
关键词 550 KV 主变压器 变压器线圈 局部放电 绝缘试验 超声定位 智能在线监测 550 kV main transformer transformer coil partial discharge insulation test ultrasonic location smart on-line monitoring
  • 相关文献

同被引文献13

引证文献1

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部