摘要
分析了当涂电厂2×600 MW机组湿式石灰石(石灰)-石膏法烟气脱硫废水的形成以及各种污染物来源,阐述脱硫废水处理系统工艺流程。归纳脱硫废水处理系统在实际运行中出现的问题,并对现有工艺处理中出现的问题提出相应的改进措施。
Analyzed the formation of flue gas desulfurization wastewater and source of various pollutants from wet limestone(lime)—gypsum method of 2 X 600 MW units in Dangtu power plant,the desulfurization wastewater treatment system process flow was elaborated.The existing problems were inductive in actual operation;put forward the corresponding improvement measures for the problems in the treatment of existing craft.
出处
《安徽电力》
2014年第S1期9-11,共3页
Anhui Electric Power
关键词
发电厂
烟气脱硫
脱硫废水
存在问题
改进措施
power plant
flue gas desulfurization
desulfurization wastewater
existing problem
improvement measures