摘要
针对单回路500 kV输电线路升高改造过程中常规方法的不足,提出新的方法来实现线路在停电时间内完成项目改造,为类似线路升高改造工程开辟新途径。
Aimed at the shortage of normal method which was used in the process of 500 kV single circuit transmission lines elevaling transformation project,a new method was put forward;which implemented line to complete the project transformation in the outage time,in order to open up new way for similar line elevating transformation project.
出处
《安徽电力》
2014年第S1期26-27,35,共3页
Anhui Electric Power
关键词
500
KV
输电线路
不落地
升高
改造
施工方法
500 kV
transmission line
don't fall to ground
elevating
transformation
construction method