2×1000 MW新建机组风道及煤粉管道布置方案优化 被引量:3

Optimization of New Unit Air Duct and Pulverized Coal Pipeline Layout Scheme(2×1000 MW)
下载PDF
导出
摘要 随着燃煤机组容量的不断扩大,风量、送风压力和风道截面也相应增加,对发电厂布置的影响也越来越大,此外发电厂对节能降耗的要求提高,降低风道阻力、提高流场均匀性的设计技术也逐步得到重视。抚州电厂2×1 000 MW工程从风道结构型式、风道和煤粉管道布置特点等进行合理的优化,使其达到高质量、低造价、低运行成本的目标。 As the coal fired unit capacity increasing,air volume,pressure and air duct section increased accordingly,which impact on the power plant layout,and higher requirements of energy saving and reduce consumption for power plant,in addition,it's pay more attention on the design technology of decreasing air duct resistance and increasing flow field uniformity.Fuzhou power plant project(2 × 1000 MW) optimizes from the air duct structure type,the air duct and the pulverized coal pipe layout,and reaches the target of high quality,low construction price and low operation cost
作者 倪培林
出处 《安徽电力》 2015年第4期32-34,共3页 Anhui Electric Power
关键词 发电厂 风道 煤粉管道 布置方案 优化 节能降耗 power plant air duct pulverized coal pipe layout scheme optimization energy saving and consumption reduce
  • 相关文献

参考文献1

  • 1GB 50660-2011.大中型火力发电厂设计规范[S]. 2011

共引文献3

同被引文献42

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部