摘要
近年来,大管径大运量的管状带式输送机在物料输送系统中应用越来越多,但在电厂燃煤输送系统应用较少。新集板集电厂一期工程在远距离燃煤输送中使用管状带式输送机DG500,通过优化设计、调试运行,保证了稳定可靠运行,运行输送量达到了额定输送能力。其成功实践和运行经验,对煤电一体化坑口电厂的燃煤输送系统设计、运营,具有一定的示范作用。
In recent years, tubular belt conveyor with large diameter and large capacity are used more and more in material delivery system, and are few in the power plant coal transportation system.In the first-stage project, the tubular conveyor Belt DG500 are used in the long-distance coal transportation. Through the optimized design and commissioning operation, the stable and reliable operation is guaranteed and the running capacity reaches the rated capacity.For the coal transportation system design and operation of the coal and power integrated pithead power plant, the successful practice of this project has a certain demonstration effect.
出处
《安徽电力》
2017年第4期39-41,共3页
Anhui Electric Power
关键词
火电厂
燃煤输送系统
管状带式输送机
优化设计
煤电一体化
power plant
coal transportation system
tubular belt conveyor
optimization design
coal and electricity integration