嘉兴互通立交桥现浇连续梁施工技术 被引量:1

CONSTRUCTION TECHNIQUE OF CASTING CONTINUOUS BEAMS IN SITU FOR HUTONG OVERPASS BRIDGE IN JIAXING CITY
下载PDF
导出
摘要 详细介绍了嘉兴互通立交桥连续梁施工中对软基段进行地基处理后搭设满樘支架、在跨越既有高速公路段采取梁柱支架悬吊模板法施工技术 ,对类似工程具有借鉴意义。 During construction of continuous beams for Hutong overpass bridge in Jiaxing City, the construction technique of setting up the full space support after foundation treatment at bridge sections with soft soil foundation, as well as adopting suspension formworks method with beam column support at bridge sections across the existing expressways, are introduced in detail in this paper. They are valuable as reference for the similar engineering projects.
出处 《铁道工程学报》 EI 2002年第1期34-37,共4页 Journal of Railway Engineering Society
关键词 嘉兴互通立交桥 现浇 施工技术 连续梁 满樘支架 梁柱支架 悬吊模板 overpass bridge continuous beam full space support beam column support suspension formwork