期刊文献+

新建有岩爆倾向硬岩矿床采矿技术研究工作程序 被引量:11

Working Procedure of Developing a New Deep Hard-rock Burst-prone Deposit
下载PDF
导出
摘要 目前矿山的岩爆研究工作大都是围绕着如何预报和防治岩爆展开的 ,针对如何开展新建或尚未发生过岩爆矿山的岩爆研究工作不多。文章重点探讨了新建有岩爆倾向硬岩矿床开采技术研究工作程序 。 Most of the research work on rockburst in the world is now concentrated on the prediction,control and prevention of rockburst.Few work has been done on how to proceed the rockburst research in developing a new mine with rockburst tendency.In this paper,the authors create a general working procedure to develop a new hard\|rock burst\|prone mine.The general procedure is divided into 6 steps:initial determination of burst tendency;study of the proneness to rockburst of typical rock samples;in\|situ rock stress measurement;possibility of strain burst in the mine;principles in the selection of mining techniques; setting up seismic monitoring system.The above study results lays a theoretical foundation for applied research of deep hard\|rock burst\|prone mining. [
作者 郭然 于润沧
出处 《中国工程科学》 2002年第7期51-55,共5页 Strategic Study of CAE
关键词 硬岩矿床 岩爆 采矿技术 工作程序 矿山 危险性 防治 压力 rockburst mining technique working procedure
  • 相关文献

参考文献4

  • 1Singh S P. Classification of mine workings according to their rockburst proneness [ J ]. Mining Science and Technology, 1989, (8): 253~ 262
  • 2郭然,于润沧.冬瓜山铜矿岩爆倾向性分析[J].有色金属,1998,50(4):16-20. 被引量:8
  • 3Rorke A J, Brummer R K. The use of explosives in rockburst control techniques [ A ]. Rockbursts and seismicity in mines [ C ]. Balkwma: Faihurst ( ed. ),Rotterdam, 1990. 377~ 384
  • 4Lightfoot N. Rockburst control in the South African deep level gold mining industry [A]. Rock Mechanics[C]. Balkema: Aubertin Hassani and Mitri (eds),Rotterdam, 1996. 295~303

二级参考文献1

共引文献7

同被引文献208

引证文献11

二级引证文献219

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部