摘要
茂名电厂 5 #机汽轮发电机基座底板为大体积混凝土 ,为确保混凝土质量 ,需要对混凝土进行温度控制 ,在施工过程中 ,通过采取合理施工工艺以及采取有效的温控措施 ,混凝土没有出现温度裂缝 ,确保 5 #汽机施工质量。
The foundation of 5 # steam electric generator in Maoming thermoelectric plant is the big-bulk concrete. In order to guarantee the quality of concrete, it requires temperature control on it. During the construction, by using reasonable construction technology and the effective temperature control measures, there is no temperature break on the concrete, and the construction quality of 5 # steam electric generator is guaranteed.
出处
《茂名学院学报》
2002年第1期49-51,共3页
Journal of Maoming College