摘要
对烟气系统的阻力进行了理论计算及测试 ,结果发现 ,锌精馏铅塔烟气系统中烟囱抽力不够。最后 ,提出了一些合理建议 ,为锌精馏铅塔烟气系统的改造提供依据。
In order to ensure normal work of smoke system in lead column in the course of zinc refining , academic calculation and measure about the resistance of smoke system are carried through The results of study reveal that drawing out force of chimney is inadequate, which is mainly caused by longer rump flue Finally, some reasonable advices are brought forward, which will give rebuilding of smoke system in lead column in the course of zinc refining reliable basis
出处
《有色金属(冶炼部分)》
CAS
2002年第4期8-9,36,共3页
Nonferrous Metals(Extractive Metallurgy)
基金
国家计委高技术产业示范工程基金 ( 2 0 0 0 1884 )
关键词
锌精馏铅塔
烟气诊断
炼锌
故障诊断
Zinc refining
Smoke system
Lead column
Diagnosis and study