通过京杭运河 3座新建船闸工程事例 ,对大体积水工混凝土温度裂缝的原因和机理进行分析 ,提出了防止温裂的措施和建议 ,供设计施工参考。
Based on the engineering practice of 3 newly-built shiplocks in Beijing-Hangzhou Canal, the reasons and mechanism of thermal cracks in marine bulk concrete are analyzed, and measures and suggestions on preventing thermal cracks are put forward, which may serve as reference for design and construction.