摘要
针对我国加入WTO ,为规范建设工程市场秩序 ,分析了现状与现行计价方式的弊端。认为应遵循价值规律 ,采用国际通用的量价分离计价模式 ,积极推行工程量清单计价方法 ,推进以市场形成价格的管理模式 。
It analyzes the current status and the mal practice of the current pricing method in order to standardize the order of the construction market after China's entry into WTO. It thinks that the internationally used pricing mode on the basis of separating working amount with the price shall be adopted, pricing method based on the finished work bill and the management mode of price formation based on the market shall be promoted according to the value regulation. The management system for construction cost shall be connected with the international economic regulation.
出处
《硫磷设计与粉体工程》
2002年第4期30-32,共3页
Sulphur Phosphorus & Bulk Materials Handling Related Engineering