摘要
根据托海拱坝 5号坝段、7号坝段倒垂线实测资料分析 ,说明了新疆寒冷地区坝体采取聚胺脂喷涂施工措施后对坝体变形的影响 ,以及右坝肩渗漏对右坝肩岩体的影响。分析结果为托海水电站通过国家电力公司大坝安全监察中心大坝安全首次定检提供了科学依据。
According to the measured data of No.5 and No.7 dam sections of the Tuohai arch dam, this paper analyzes the effect of heat preservation methods on dam deformation in the cold area, and the effect of seepage at the right abutment of the dam on the rock. The results of analysis provide a science basis for the first examination of the Tuohai Hydropower Station.
出处
《水电自动化与大坝监测》
2002年第4期57-60,67,共5页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
新疆
坝体
变形监测
托海水电站
拱坝
径向位移
切向位移
时效位移
Tuohai hydropower station
arch dam
radial displacement
tangential displacement
time-effect displacement