4Barbulescu L,Watson J P,Whitley L D. Scheduling Space-ground Communications for the Air Force Satellite Control Network[J].Journal of Scheduling,2004,(01):7-34.
5Gooley T D. Automating the Satellite Range Scheduling Process[EB/OL].http://adsabs.harvard.edu/abs/1993aifo.reptR,2010.
6Verfaillie G,Schiex T. Solution Reuse in Dynamic Constraint Satisfaction Problems[A].Washington,DC:USA,1994.
7Mittal S,Falkenhiner B. Dynamic Constraint Satisfaction Problems[A].IEEE Press,1990.