摘要
通过对广州市大坦沙污水处理厂直接影响AA/O活性污泥法工艺的几个主要参数的长期调试和检测 ,得出了适合实际水质和工艺需要的经验值。
Through long term adjustment and testing of several main parameters which directly affect the process for AA/O active slurry method in Guangzhou Datansha sewerage treatment plant, the empirical value necessary for actual water quality and process was obtained
出处
《冶金矿山设计与建设》
2002年第4期26-29,共4页
Metal Mine Design & Construction