摘要
针对双江口水电站地下厂区的复杂渗流问题,采用三维有限元法和多变量多阶优化法,反演了地下厂区天然渗流场,并对比分析了不同渗控方案下地下厂区的渗流场、渗流量等分布特征。结果表明,地下厂区天然地下水位较高,排水廊道及排水孔幕的排水降压效果显著。
Abstract.. In view of complex seepage of Shuangjiangkou hydropower underground plant, three-dimensional finite element method and multivariate multi-stage optimization method are used to analyze natural seepage field of underground plant. The piant's underground seepage field, seepage flow and other distribution characteristics are comparative analysis under the different seepage control schemes. The results show that the natural groundwater level of underground plant is higher, drained-depressurization effect of drainage gallery and drain hole curtain are obvious.
出处
《水电能源科学》
北大核心
2014年第7期78-82,共5页
Water Resources and Power
基金
国家自然科学基金项目(51079092)
关键词
高土石坝
地下厂区
天然渗流场
渗控措施
反演分析
Key words., high earth rockfill dam
underground powerhouse zone
natural seepage field
seepage control measures
back analysis