珠澳口岸人工岛水泥搅拌桩施工质量控制 被引量:4

Cement mixing pile construction quality control of the Zhuhai-Macao Port artificial island
下载PDF
导出
摘要 结合港珠澳大桥珠澳口岸人工岛西北护岸水泥搅拌桩施工,简述水泥搅拌桩施工质量控制要点和方法。水泥搅拌桩施工质量控制的关键为水泥搅拌机型的选择、水泥品牌的选用、水泥掺入量和每延米用量的选配、桩位、桩径和垂直度的控制、施工参数的确定。 Combined with the cement mixing pile construction of the northwest revetment of the artificial island in the HZMB, this paper describes the construction quality control points and methods of cement mixing piles. The key points for the quality control are the selection of cement mixer types, the selection of cement brands, the cement content, the matching amount per linear meter, the control of pile location, pile diameter and the vertical degree, construction parameters , and the determination of construction parameters.
作者 李连明 周宇
出处 《中国港湾建设》 2014年第6期45-47,共3页 China Harbour Engineering
关键词 水泥搅拌桩 施工质量控制 要点和方法 cement mixing pile construction quality control elements and methods
  • 相关文献

参考文献4

  • 1DL/T5425--2009,深层搅拌法技术规范[S].
  • 2中交第四航务工程勘察设计院有限公司.港珠澳大桥珠澳口岸人工岛填海工程施工图设计说明[R].2009.
  • 3JTS257-2008,水运工程质量检验标准[S].
  • 4中交第四航务工程勘察设计院有限公司.港珠澳大桥珠澳口岸人工岛填海工程施工图设计技术标准和要求[R].2009.