摘要
以具体工程为例,对某冲沟回填区岩土工程勘察前期准备工作进行了介绍,通过外业勘探工作及内业资料整理,提出了几点地基处理方案的建议,不仅缩短了工期,而且为建设单位节省了投资。
Taking specific project as an example,this paper introduced the investigation and preliminary work of a gully backfill area geotechnical engineering,through field exploration work and office operation data consolidation,put forward several suggestion of foundation treatment scheme,not only shorten the construction period,also save the investment for construction unit.
出处
《山西建筑》
2014年第21期105-106,共2页
Shanxi Architecture
关键词
岩土工程
勘察
场地
冲沟回填区
geotechnical engineering
survey
site
gully backfill area