文中结合南水北调中线SG7标段的施工,探讨了膨胀土段的换填施工工艺,同时简要介绍了施工期间的排水、膨胀土的开挖、渠基排水系统的施工等工艺。
Combining with the construction of SG7 Bid in South-to-North water diversion central line project,this paper discusses the canal expansive soil's replacement technology.It briefly introduces the following construction technologies as site drainage,expansive soil excavation,canal foundation drainage,and clay soil's replacement.
出处
《河北工程技术高等专科学校学报》
2014年第2期21-24,27,共5页
Journal of Hebei Engineering and Technical College Quarterly
关键词
膨胀土开挖
施工排水
换填施工
碾压参数
expansive soil excavation
site drainage
replacement construction
rolling parameters