摘要
综合机械化放顶采煤工艺装备的运输和、安装和撤除消耗大量的人力和物力,如何改进技术,减轻劳动量,提高效率,保证安全是一项课题,本文就自己多年的安装撤除经验,突破传统,积极革新,创出了一套的独到方法,取得了很好的效果。
The comprehensive mechanized caving mining technology and,the transportation and installation and removal of the equipment of fully mechanized caving face consumes a lot of manpower and material resources,how to improve technology,reduce the amount of labor,improve efficiency,ensure safety is an issue,according to several years of experience of installation and recovery,breaking through the tradition,positive innovation,created a set of unique methods,and achieved very good results.
出处
《山东煤炭科技》
2014年第6期132-132,135,共2页
Shandong Coal Science and Technology
关键词
综放工作面
垂直减速箱
后部运输机
挺面和缩面
fully mechanized caving face vertical reducer rear conveyor recovery and shrinking face