摘要
针对阳煤集团二矿+470水平南翼主运输的改造,分析了主运输系统的改造方案的设计思路及方法。从技术安全和经济上分析了两个方案,提出了新掘南翼胶带主运巷、新掘东主斜井井底煤仓的方案。
According to+470 horizontal south wing main transport system in No.2 mine of Yangquan Coal Group, two transformation plans were studied in terms of thoughts and methods. Based on the analysis of technical safety and economy of the two plans, we selected one with new main belt transport lane in the south wing and new coal bunker in the main shaft in the east.
出处
《山西煤炭》
2014年第7期34-36,39,共4页
Shanxi Coal
关键词
主运系统
轨道运输
胶带运输
main transport system
rail transport
belt transport