垂准仪法超高层建筑平面控制网竖向传递 被引量:8

The Use of Collimator Method in the Transfer of Horizontal Control Network
下载PDF
导出
摘要 近年来,随着经济的发展和土地资源的紧缺,超高层建筑越来越多,高度也越来越高,施工测量的难度也越来越大,如何准确地实现超高层建筑平面控制网竖向传递成为超高层建筑施工测量的难点和重点。垂准仪法受环境影响小,投测距离大,效率高,误差小,是目前超高层建筑平面控制网竖向传递内控法的主要方法,本文以某超高层建筑为例,论述了垂准仪法平面控制网竖向传递的具体实现及精度检核方法。 In recent years,with the development of economy and the shortage of land resources ,there are more and more super high-rise buildings,They become higher and higher ,construction survey becomes more and more difficult , How to accurately realize plane high-rise building control network vertical transmission has become the emphasis and dif -ficulty in the super high-rise building construction measurements .Collimator method is less affected by the environment , projection distance ,high efficiency ,small error,is the main method for plane high-rise building control network vertical transfer control method ,Taking some super high-rise building as an example ,this paper describes the use of collimator in the transfer of horizontal control network and the accuracy assessment .
作者 陈展鹏
出处 《城市勘测》 2014年第3期118-120,共3页 Urban Geotechnical Investigation & Surveying
基金 国家自然科学基金资助项目(40574005)
关键词 超高层建筑 垂准仪法 竖向传递 倾斜偏差测量 精度检核 super high-rise building collimator method vertical transmission slope deviation measurement accura-cy check
  • 相关文献

参考文献7

二级参考文献28

共引文献951

同被引文献33

引证文献8

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部