摘要
以福建省龙岩市古田镇的电力规划为例,结合该镇的地理条件和人口分布情况,分析当前电力网络布局存在的不足。根据该镇的城镇规划方案,采用合理的预测方法对该镇的用电量进行预算,并对该镇的变电站布点和高压网络布局进行规划。
Longyan City, Fujian Province Gutian Town planning of power, combined with the geographical conditions and the town's population distribution, analysis of the current shortage of electricity distribution networks exist. According to the town's urban planning scheme, and using a reasonable method of forecasting budgeting town's electricity, and the town's substation and high voltage distribution network layout planning.
出处
《科技与创新》
2014年第10期119-119,125,共2页
Science and Technology & Innovation
关键词
电力规划
变电站
主变容量
负载率
power planning
substation
main transformer capacity
load rate