冀中能源股份公司水泥厂2500t/d熟料生产线的达产调试

Cement Plant of Jizhong Energy Corporation Clinker Reaching Production of 2500t/d Commissioning Adjustment
下载PDF
导出
摘要 本文介绍了冀中股份水泥厂2 500 t/d新型干法水泥熟料生产线在达产调试期间出现的原料磨系统产量低、烧成系统结皮、结蛋等问题,并结合生产工艺及设备情况,分析了问题原因,提出了解决措施。 The thesis introduced cement plant of Jizhong Energy Corporation, problems that raw material grinding system, low yield, firing system problem such as crust, eggs during 2 500 t/d new dry process cement clinker production line in reaching production adjustment, combined with the production technology and equipment, the reason and problem were analyzed, and the solving measures were put forward.
作者 王新涛
出处 《煤炭与化工》 CAS 2014年第6期137-139,共3页 Coal and Chemical Industry
关键词 水泥熟料 原料磨系统 烧成系统 达产调试 cement clinker raw material grinding system firing system reaching producing adjustment