摘要
本文介绍了冀中股份水泥厂2 500 t/d新型干法水泥熟料生产线在达产调试期间出现的原料磨系统产量低、烧成系统结皮、结蛋等问题,并结合生产工艺及设备情况,分析了问题原因,提出了解决措施。
The thesis introduced cement plant of Jizhong Energy Corporation, problems that raw material grinding system, low yield, firing system problem such as crust, eggs during 2 500 t/d new dry process cement clinker production line in reaching production adjustment, combined with the production technology and equipment, the reason and problem were analyzed, and the solving measures were put forward.
出处
《煤炭与化工》
CAS
2014年第6期137-139,共3页
Coal and Chemical Industry
关键词
水泥熟料
原料磨系统
烧成系统
达产调试
cement clinker
raw material grinding system
firing system
reaching producing adjustment