针对辽宁调兵山煤矸石电厂2号CFB锅炉,在运行中多次发生旋风分离器堵塞事故。从CFB锅炉结构、设备维护、运行调整等几方面进行分析,并提出了解决方法。
For Liaoning Diaobingshan 2nd CFB boilers in gangue power plant, Cyclone separator blocking incident occurred more than once in the running.Runs from CFB boiler structure,equipment maintenance, adjustment, as well as an analysis, and proposes solutions.
出处
《科技与企业》
2014年第14期436-436,共1页
Science-Technology Enterprise