摘要 在编制控制性详细规划阶段,应开展相应的交通分析研究。路网容量限制是确定土地开发强度的重要影响因素,结合路网容量概念,提出了相应的土地开发强度研究方法。应用时空消耗法确定路网容量,并采用Trans CAD交通模型分配进行OD加载验证。结果表明,该方法有效建立了路网容量与土地开发强度的对应关系,为控规编制过程中土地开发强度的合理确定提供技术参考。 Traffic analysis should be carried on at the regulatory planning stage. The capacity of road network is the most important factor of land development intensity, considering the concept of road network capacity, puts forward the method of land development intensity. Using the space-time consumption method to determine the capacity of network, thenuse the Trans CAD traffic assignment model to verify. The result shows that, the method establishes the relationship between road network capacity and land development intensity, and provides reasonable technical reference to the study during regulatory planning.
作者 吕雄鹰
出处 《交通与运输》 2014年第A01期1-5,共5页 Traffic & Transportation
关键词 路网容量 开发强度 时空消耗法 0D加载法 Capacity of road network Land development intensity Time and spaceconsummation method OD loading method
  • 相关文献

参考文献4

二级参考文献33

共引文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部