摘要 在建设桥梁工程的过程中,桥梁的桩基施工是一个十分重要的部分,桥梁的桩基都是长期处于地面之下且被深深的填埋,而大部分的施工工地地区的地下水含量都相对较高。因此,解决桥梁基础施工中的施工工艺成为了施工队伍长期进行探讨和开发的首要任务。由此,不难看出桥梁的桩基础的安装质量将对于桥梁的整体质量产生关键性的影响。 In the process of the construction of the bridge project, the construction of the bridge is a very important part of pile foundation of bridge, is long in the ground and was deeply buried, and groundwater in most of the site construction area are relatively high. Therefore, to solve the construction technology of bridge foundation construction has become the primary task and development of long - term US construction team. The influence of the installation quality, we can see the bridge pile foundation will be the overall quality of the bridge is crucial
作者 廖立新
出处 《物流工程与管理》 2013年第9期194-195,共2页 Logistics Engineering and Management
关键词 桥梁桩基 工艺 质量 施工 bridge pile foundation technology quality construction
  • 相关文献

参考文献5

  • 1.GB50007-2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002..
  • 2JTG D63-2007,公路桥涵地基与基础设计规范[S].北京:人民交通出版社,2007.
  • 3张峰.双壁钢围堰施工桥梁基础在不同条件下若干问题的处理办法[D].成都西南交通大学,2007.
  • 4高锋金.桥梁桩基础钻孔灌注桩施工技术浅析[J].中小企业管理与科技,2011(21):113-114. 被引量:29
  • 5中铁八局兰渝铁路工程指挥部工程师张菲.浅谈大桥连续梁支架现浇的施工技术[N].中华建筑报,2009.

共引文献250

同被引文献6

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部