1A.Ang, J.Briscoe, et al. Development of a system risk methodology for Single and Muhimodel Transportation system [R]. Final Report, Office of University Research, U.S. DOT, Washington, D.C., 1989.
2G. F. L ist, P. BM irchandani, et al. Modelling and analysis for hazardous materials transportation: Risk analysis, routing scheduling and facility location [J]. Transportation Science, 1991, 25(2):100-114.
3W. R. Rhyne. Hazardous materials transportation: Quantitative approach for truck and train [M]. Van No strand Reinhold, 1994.
4M. H. Pate, A.J. Horowitz. Optimal routing of hazardous materials considering risk of spill [J]. Transportation Research A, 1994,(28): 119:132.
5John Current. A model to assess risk, equity and efficiency in facility location and transportation of hazardous materials [J]. Location Science, 1995, 3(3): 187-201.
6A. Boulmakoul, K. Zeitouni, R. Laurini, M. A. A ufaure Spatial decision support system for hazardous materials transportation planning [R]. In IFAC Transportation systems ' 97,16-18 June, Ghania, Greece (pp. 611-616).
7S. Bonvicini, P. Leonelli, G. Spadoni. Risk analysis of hazardous materials transportation: evaluating uncertainty by means of fuzzy logic [J]. Journal of Hazardous Materials, 1998, (62): 59-74.
5[1]Hazardous material transportation risk analysis : quantitative approaches for truck and train.William R.Rhyne [mnograph],New York Van Nostrand Reinhold c1994
6[2]Quantitative risk assessment of hazardous materials transport systems: rail, road, pipelines.Nicolet- Monner Michel,1996
7[3]CCPS (1995) Guidelines for chemical transportation risk analysis. AIChE, New York
8B. Fabiano, F. Curro, E. Palazzi, ect. A framework for Risk Assessment and Decision-making Strategies in Dangerous Good Transportation [J]. Hazardous Materials, 2002, 93:1-15.
9Roberto Bubbico, Cinzia Ferrari, Barbara Mazzarotta. Risk Analysis of LPG Transport by Road and Rail[J]. Loss Prevention in the Process Industries, 2000, 13:27-31.