期刊文献+

Approaching lean product development using system dynamics:investigating front-load effects 被引量:1

Approaching lean product development using system dynamics:investigating front-load effects
原文传递
导出
摘要 Competing with successful products has become perplexing with several uncertainties and transmutes from time to time as customers' expectations are dynamic.That is why manufacturing firms exhaustively strive to look for a better competitive frontier using wellestablished and innovative product development(PD)processes.In this paper,we would like to answer three research questions:(i)What would be the effects of frontloading in PD?(ii)Can we improve our PD process endlessly?(iii)When is the critical time that the firm should take remedial action for improvements?As a contribution to the vast numbers of improvement methods in new product development(NPD),this paper investigates the effects of front-loading using set-based concurrent engineering(SBCE)on cost and lead time.Models are developed and treated using a system dynamics(SD)approach.We assign a hypothetical upfront investment for SBCE and compare its effects on total cost and lead time of the development process.From the research,it is found that the total cost of PD is reduced almost by half-although the front loading is higher in order to encompass multiple design alternatives.The total product lead time is reduced by almost 20%.The model reveals the critical time for improvement of the PD process.We use SD tool(e.g.,STELLA)for simulation and visualization of the complex PD model,using SBCE as one of several strategies to frontload activities in the NPD process. Competing with successful products has become perplexing with several uncertainties and transmutes from time to time as customers' expectations are dynamic.That is why manufacturing firms exhaustively strive to look for a better competitive frontier using wellestablished and innovative product development(PD)processes.In this paper,we would like to answer three research questions:(i)What would be the effects of frontloading in PD?(ii)Can we improve our PD process endlessly?(iii)When is the critical time that the firm should take remedial action for improvements?As a contribution to the vast numbers of improvement methods in new product development(NPD),this paper investigates the effects of front-loading using set-based concurrent engineering(SBCE)on cost and lead time.Models are developed and treated using a system dynamics(SD)approach.We assign a hypothetical upfront investment for SBCE and compare its effects on total cost and lead time of the development process.From the research,it is found that the total cost of PD is reduced almost by half-although the front loading is higher in order to encompass multiple design alternatives.The total product lead time is reduced by almost 20%.The model reveals the critical time for improvement of the PD process.We use SD tool(e.g.,STELLA)for simulation and visualization of the complex PD model,using SBCE as one of several strategies to frontload activities in the NPD process.
出处 《Advances in Manufacturing》 SCIE CAS 2014年第2期130-140,共11页 先进制造进展(英文版)
关键词 Front-loading Set-based concurrent engineering(SBCE) INNOVATION Lean product development(LPD) System dynamics(SD) Front-loading Set-based concurrent engineering(SBCE) Innovation Lean product development(LPD) System dynamics(SD)
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部