期刊文献+

浅谈龙潭水电站进水口滑坡的综合治理

Discussion on the landslide control in water inlet of Longtan hydroelectric power station
下载PDF
导出
摘要 通过对龙潭水电站进水口滑坡山体采取引水、减载、锚固、支撑、覆盖等5种不同治理方法进行综合治理并取得成功的工程实例,论证了单一的治理方式不一定能完全治理好山体滑坡,必须根据工程具体情况同时采取多种方式才能有效地综合治理滑坡。 Five kinds of methods, such as water diversion,load relief, adherence, support, coverage, were used to control the landslide in water inlet of Longtan hydroelectric power station,and it achieved success. Based on this successful project,it was discussed that single measure can not control the landslide completely, and it would be effective that comprehensive treatment measures were applied simultaneously according to the project actual situation.
作者 邬宇平
出处 《中国矿山工程》 2014年第4期78-79,共2页 China Mine Engineering
关键词 滑坡治理 引水 减载 锚固 支撑 覆盖 landslide control water diversion load relief adherence support coverage