摘要
以一座公路箱梁桥固结墩解除施工为例,介绍了其施工步骤、方法及控制要点,并通过比较,指出采取对桥梁体系转化,解除固结墩,安装支座的方案,较之拆除重建缩短了施工工期,节省了投资,具有明显的经济效益。
Taking the bridge consolidated pier removal construction as an example,the paper introduces its construction procedures,construction methods and control points. Through comparison,it points out that:applying system conversion,removing consolidated pier and installing brack-et scheme shortens construction duration,and saves investment,which has obvious economic benefits.
出处
《山西建筑》
2014年第22期180-181,共2页
Shanxi Architecture
关键词
桥梁
固结墩
施工技术
bridge
consolidated pile
construction technology