摘要
结合承接的外资项目工程经验,从概念、人工时和S曲线的生成等方面入手,对项目实施阶段的四级进度计划进行了阐述说明,指出采用S进度曲线比较法,可直观的比对并判断实际进度与计划进度的差值,进而了解项目的整体运行情况。
Combining with foreign funded project engineering experience, starting from aspects of concept, labor man-hour and S curve generation, the paper describes the four-grade schedule planning at project implementation phase, and points out advantages of S-curve schedule comparison method, which can tell the difference of actual schedule and planned schedule and know out the integral project operation conditions as well.
出处
《山西建筑》
2014年第22期271-272,共2页
Shanxi Architecture
关键词
四级进度计划
S曲线
人工时
four-grade schedule plan, S curve, labor man-hour