谈外资项目中的进度管理S曲线生成 被引量:1

Discussion on schedule management S curve generation of foreign funded project
下载PDF
导出
摘要 结合承接的外资项目工程经验,从概念、人工时和S曲线的生成等方面入手,对项目实施阶段的四级进度计划进行了阐述说明,指出采用S进度曲线比较法,可直观的比对并判断实际进度与计划进度的差值,进而了解项目的整体运行情况。 Combining with foreign funded project engineering experience, starting from aspects of concept, labor man-hour and S curve generation, the paper describes the four-grade schedule planning at project implementation phase, and points out advantages of S-curve schedule comparison method, which can tell the difference of actual schedule and planned schedule and know out the integral project operation conditions as well.
出处 《山西建筑》 2014年第22期271-272,共2页 Shanxi Architecture
关键词 四级进度计划 S曲线 人工时 four-grade schedule plan, S curve, labor man-hour
  • 相关文献

参考文献1

二级参考文献3

  • 1ESI培训教材《Project ManagementPrinciple Trainning》book.
  • 2ISBN7-5053-7730-2《Excel2002公式与函数应用宝典》/(美)沃肯巴赫著;路晓村等译.北京电子工业出版社2002.7.
  • 3Novartis Commissioning Guideline (SNPT2007).

共引文献4

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部