摘要
就吊装施工过程中吊车支撑应力计算理论及计算模型进行了阐述,论述了利用计算机V-foxpro高级语言编程思想及编程流程,降低了理论计算难度与吊装施工的安全风险,使施工过程更具有科学性与准确性。
This paper depicts crane support stress calculation system and calculation model in the process of crane lifting construction. It also discusses that by using of computer V-foxpro high-level language programming ideas and programming processes, theoretical computing difficulty and the risks of hoisting construction have been reduced, so that the construction process can be more scientific and accurate.
出处
《山西建筑》
2014年第22期282-284,共3页
Shanxi Architecture
关键词
吊车支撑
力学计算
计算机处理
crane supporting, mechanical calculations, computer processing