复杂地质情况下的地基处理技术在沉井施工中的应用研究 被引量:3

Study on Open Caisson Construction Method by Using Foundation Treatment Technology Under Complicated Geological Conditions
下载PDF
导出
摘要 宁波钢铁有限公司余能电厂循环水泵房沉井下沉施工方法采用了排水下沉方式。由于沉井处地质情况复杂,同时下部大部分土质为淤泥质粉质黏土,土层承载力低;另外,沉井距离正在使用的高空管架廊道仅6 m,因此,在沉井制作和下沉前对上述地质情况进行了地基改良处理,确保了沉井施工的安全,亦为类似工程积累了经验。 The drainage sinking method has been used for the circulating water pump house caisson sinking construction in Ningbo Steel Company Yuneng Power Plant. The caisson locates in a complicated geological condition, and the most of the lower soil is silty clay with reletively low bearing capacity. Besides, the distance between the caisson and the high pipe racks corridor is only 6 m, so before the caisson making and sinking, the foundation soil improvement should be conducted, which led to a successful completion of the caisson construction and accumulated experience for similar projects.
作者 陈斌
出处 《建筑施工》 2014年第7期864-865,共2页 Building Construction
关键词 沉井施工 地质条件 土体改良 构筑物保护 障碍物处理 排水下沉 caisson sinking construction geological condition soil improvement structures protection obstacles treatment drainage sinking
  • 相关文献

参考文献5

二级参考文献3

  • 1葛春辉,王广平,王恒栋等.CECSl37—2002给水排水工程钢筋混凝土沉井结构设计规程[Z].北京:中国建筑工业出版社,2003.
  • 2滕延京,黄熙龄,王曙光等.GB50007-201l建筑地基基础设计规范[Z].北京:中国建筑工业出版社,2012.
  • 3赵基达,徐有邻,黄小坤等.GB50010-2010混凝土结构设计规范[Z].北京:中国建筑工业出版社,2011.

共引文献23

同被引文献8

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部