期刊文献+

综放工作面设备高效安装的实践与分析 被引量:3

Practice and analysis of fully mechanized top coal caving working face installation
下载PDF
导出
摘要 田陈煤矿3下7110综放工作面是矿井接续生产的主采工作面,其安装安全和安装效率决定了矿井的生产接续。本文从优化提升运输环节,合理设计组装硐室结构方式和调架方式等几个方面介绍了提高7110综放工作面高效安装的具体做法,该综放工作面设备的高效安装对与缓解矿井紧张接续的局面具有十分重要的现实意义。 Tian Chen coal mine 37110 fully mechanized top coal caving face is the main mining working face in the mineproduction, its safety installation and installation efficiency determines the production in coal mine. This paper introducesthe specific practices to improve the installation efficiency of 7110 working face, from the optimization of hoist and trans-port links, the rational design of the assembly chamber structure and the mode adjusting support direction , the high efficient installation of the working face has very important practical significance to relieve the tense situation between miningand excavating.
作者 车本方
出处 《山东煤炭科技》 2014年第7期49-50,共2页 Shandong Coal Science and Technology
关键词 生产接续 高效安装 组装硐室 调架方式 production continues efficient installation assembly chamber mode adjusting support direction
  • 相关文献

同被引文献11

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部