摘要
该文结合何岗煤矿35kV变电站工程实例,详细分析了煤矿35kV变电站设计方案中供电电源及主接线的选择和主要电气设备的选型方法、布置形式,简要说明了变电站所用电以及计量方式的确定方案。
This paper combined Hegang coal mine 35kV substation as an example, detailly analyzed the power supply,the choice of the main electrical equipment and the main wiring,and the layout method in coal mine 35kV substationdesigning scheme, briefly described the electricity and scheme of the measurement method for transformer substation.
出处
《山东煤炭科技》
2014年第7期114-115,117,共3页
Shandong Coal Science and Technology
关键词
煤矿
变电站
主接线
方案
coal mine substation main wiring scheme