以华能铜川照金电厂一期2台600MW燃煤发电机组为例,分析了"引增合一"技术改造方案,比较了改造前后的经济性,以及厂用电率的变化情况。改造后,引风机运行稳定,达到了预期改造目标。
Taking two 600 MW coal-fired power units of Huaneng Tongchuan Zhaojin Power Plant project phase I as example,the technical reformation scheme of'merging induced draft fan and booster fan'was analyzed. The economical efficiency and the auxiliary power rate of the units after reformation were compared with those indexes of the units before reformation. After the reformation,the induced draft fan operates stably,and the expected reformation goal was achieved.
出处
《华电技术》
CAS
2014年第6期30-32,78,共3页
HUADIAN TECHNOLOGY
关键词
引风机
增压风机
二合一改造
厂用电率
经济性
induced draft fan
booster fan
two-in-one reformation
auxiliary power rate
economical efficiency