摘要
介绍了输变电工程启动调试的重要性以及调控中心在启动调试过程中的技术准备工作,总结了华北电网220 ~500 kV输变电设备启动调试的典型方法,并以500 kV唐山东变电站为综合案例进行说明.
The importance of starting and commissioning work of power transmission project, and technical prepara- tions for the control center to start the debugging process were introduced in this paper. Taking the 500 kV Tangshan-Dong substation for example,the start debugging typical methods of 220 - 500 kV power transmission and transformation equipment in North China Power Grid were summarized.
出处
《华北电力技术》
CAS
2014年第7期14-19,30,共7页
North China Electric Power
关键词
输电线路
变压器
串补
变电站
启动调试
transmission lines, transformers, series compensation, substation, starting and commissioning