陡河发电厂3号炉气力输灰系统的改造

Transformation of Pneumatic Ash Handling System of Boiler No.3 in Douhe Power Plant
下载PDF
导出
摘要 大唐国际陡河发电厂3号250 MW发电机组电除尘器于1997年9月投产,并于2007年6月改造为正压浓相气力输灰系统,后出现诸多问题,严重影响机组的安全稳定运行。2012年利用电除尘增容改造的机会,对3号炉气力输灰系统进行了全面改造。文章分析对比了该气力输灰系统改造前后的运行情况。 The electrostatic precipitator of 250 MW power unit No. 3 in Datang International Douhe Power Plant was put into operation in September 1997, and in June 2007 that was transformed into a positive pressure dense phase pneumatic ash conveying system. Many problems appeared after transformation and influenced the safe and stable operation of the unit. In 2012 a comprehensive transformation of pneumatic ash conveying system of boiler No. 3 was taken during electric dust removal capacity expansion retrofit. This paper analyzed and compared the operation of the pneumatic ash handling system before and after transformation.
作者 赵军才
出处 《华北电力技术》 CAS 2014年第7期50-51,66,共3页 North China Electric Power
关键词 发电厂 除尘器 浓相 气力输灰 改造 power plant, electrostatic precipitator, dense phase, pneumatic ash, transformation
  • 相关文献

参考文献2

  • 1JB/T8470-96正压浓相气力输送系统[S].
  • 2林建民.火力发电厂除灰[M].北京:水利电力出版社,1985.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部