对韶钢八号高炉炉况严重失常的处理情况进行总结,通过提高原燃料质量和调整操作制度,使高炉炉况逐步恢复到正常生产状态水平。
The severe operation disorder of No. 8 blast furnace are summarized in Shaoguan Steel. The blast furnace condition gradually returned to normal through improving the quality of raw materials and adjusting the operating system.
出处
《江西冶金》
2014年第3期1-3,共3页
Jiangxi Metallurgy
关键词
高炉炼铁
炉况失常
处理
BF ironmaking
operation disorder
treatment