结合坝区地形地质条件,在遵循面板堆石坝设计原则的前提下,参照应力应变分析的结果调整大坝设计断面,优化坝体填料分区,充分利用开挖料上坝,拟定了经济合理的坝体断面。
Considering the topographic and geologic conditions , and the design principles for concrete face rockfill dam , optimization design is carried out for the dam section of Santasi reservoir project based on results of stress and strain analysis.Also, the partition of dam filling is optimized to fully utilize the excavated materials .
出处
《水电与新能源》
2014年第7期14-17,共4页
Hydropower and New Energy
关键词
三塔寺水库
面板堆石坝
坝体填料分区
优化设计
Santasi reservoir
concrete face rockfill dam
partition of dam filling
optimization design