千米级深立井高压注浆施工浅谈

On High Pressure Grouting Construction of Kilometric Deep Shaft
下载PDF
导出
摘要 宁夏银川宝丰能源集团有限公司建设的红四煤矿副井筒深度1002.5m,井筒表土段和部分基岩采用冻结法施工,井筒680m以下采用普通法施工,井筒的治水采用工作面预注浆方法,注浆过程中第一注浆段单孔涌水量达60m3/h,井筒均通过高压工作面预注浆后,安全穿过含水层,完成了井筒掘砌施工。 The depth of the auxiliary shaft of red coal mine is 1002.5m constructed by Ningxia Yinchuan Baofeng Energy Group Limited Company, whose shaft surface soils and bedrock use freezing method construction, wellbore below 680m uses ordinary construction method, borehole water uses face pre grouting method. In the process of grouting, the first grouting section single hole discharge up to 60m^3/h, after pit shaft’s grouting through high pressure working face, it through the aquifer safely and achieves the shaft digging.
作者 齐贺鹏
出处 《价值工程》 2014年第24期119-120,共2页 Value Engineering
关键词 井筒深度大 涌水大 高压工作面预注浆 安全穿过含水层 deep pit shaft water inrush high pressure working face pre grouting through the aquifer safely
  • 相关文献

参考文献3

二级参考文献11

共引文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部