摘要 在湿陷性黄土地区修建半填半挖路基,基底处理、路基结构早有成熟技术和经验。但在半干旱的少雨地区,偶遇持久暴雨时,在个别区段路堤侧边坡发生了垮塌等病害,分析水害形成原因,提出整治措施方案、施工注意要点以及设计建议,避免小细节酿成大灾祸,对于类似地区路基设计、施工,确保铁路运营安全,具有重要意义。 There are plenty of mature technology and experience for constructing part cut-part fill subgrade roadbed in the collapsible loess region as well as for its corresponding base treatment and roadbed structure. But in semi-arid areas, the side slope of embankment collapse happened in some sections caught in disasters like persistent heavy rains. Therefore, it is of significance to analyze the causes of water disasters, propose measures, construction key points and the design proposal so as to avoid unnecessary deadly disaster. The above-mentioned suggestions are also useful in roadbed design and construction of similar area, which can ensure the safety of the railway.
作者 刘长江
出处 《铁道建筑技术》 2014年第7期104-107,共4页 Railway Construction Technology
关键词 湿陷性黄土 半填半挖 路基水害 整治措施 collapsible loess part-cut-part fill subgrade subgrade water damage renovation measure
  • 相关文献

参考文献1

  • 1中铁四局集团有限公司.客货共线铁路路基工程施工技术指南[S]北京:中国铁道出版社,200822.

同被引文献20

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部