摘要
榆林市体育中心新建体育场基础采用封闭式环形基础梁体系+钻孔灌注桩+钢筋混凝土拱墩的形式。通过对本工程的基础进行设计,探讨在风积砂的地质条件下,依靠基础梁体系自身强度及刚度、辅以桩身水平抗力及基础周边土体的抵抗力等来承受上部大跨度拱结构产生的巨大水平推力作用和控制基础的变形量,以减少对上部结构的不利影响。
The foundation of new stadium of Yulin City Sports Center adopts the structural system of enclosed circular foundation beams, bored piles and reinforced concrete arch. Through the foundation design of the example project, it was researched how to counterbalance the huge horizontal force from the above large-span arch structure and control foundation deformation with the help of strength and stiffness of the foundation beams, horizontal resistant force of the pile and soil resistance force around the foundation on the geological condition of aeolian sand to avoid great detrimental effect on the super structure.
出处
《建筑结构》
CSCD
北大核心
2014年第14期92-95,共4页
Building Structure
关键词
封闭式环形基础梁
砂土地基
水平位移控制
水平承载力
enclosed circular foundation beam
sand ground
horizontal displacement control
horizontal bearing capacity