基于建筑信息模型的全过程设计和数字化交付 被引量:28

Whole Design Process and Digital Delivery Based on Building Information Modeling
下载PDF
导出
摘要 对比传统的建筑设计技术分析了基于建筑信息模型全过程设计的优势,着重研究基于同一数据平台下的信息模型如何从设计单位无缝传递给施工单位和业主单位,有效应用于工程的设计阶段、施工阶段和运维阶段,实现信息模型的最大化利用。研究结果表明,建筑信息模型能应用于工程的各个阶段,各阶段数据能够无缝传递,一步一步深化,直至以数字化形式交付业主。以ipad为载体移交信息模型更是一种全新的提交方式,对业主的后期运行维护有较大影响。 The advantages of whole design process based on Building Information Modeling (BIM) are analyzed by comparing with traditional architectural design technology. The seamless transfer of BIM from designer to constructors and owner under a data platform, the effective application of BIM in the design, construction and operation stages of project, and other application of BIM are emphatically studied herein. The results show that the BIM technology can be applied to various stages of engineering with seamless data transfer and final delivering the digital model to owner. Taking ipad as a carrier to transfer information model is a new way and will greatly influence the later operation and maintenance of owner.
出处 《水力发电》 北大核心 2014年第8期42-46,51,共6页 Water Power
关键词 建筑信息模型 三维设计 施工进度模拟 数字化交付 资产管理 Building Information Modeling(BIM) three-dimension design construction schedule simulation digital delivery asset management
  • 相关文献

参考文献7

  • 1LEE N, DOSSICK C, FOLEY S. Guideline for Building Information Modeling in Construction Engineering and Management Education [J]. Journqal of Professional Issues in Engineering Education & Practice, 2013, 139(4) : 476-488.
  • 2BYNUM P, ISSA R, OLBINA S. Building Information Modeling in Support of Sustainable Design and Construction [Jl. Journal of Construction Engineering and Management, 2013, 139(1): 24-34.
  • 3CAROLINE M, RICARDO K. Impact of BIM-Enabled Design-to- Fabrication on Building Delivery[J~. Journal of Practice Periodical on Structural Design and Construction, 2014, 19(1 ):122-128.
  • 4KARSHENAS S, NIKNAM M. ASCE International Workshop on Computing in Civil Engineering [C]//Building Information Modeling or Construction Safety Planning, Los Angeles, 2013, (6) : 476-483.
  • 5RAFIQ M, RUSTELL M Building Information Modeling Steered by Evolutionary Computing[J]. Journal of Computing in Civil Engineering, 2014, 28(4):1-11.
  • 6何清华,钱丽丽,段运峰,李永奎.BIM在国内外应用的现状及障碍研究[J].工程管理学报,2012,26(1):12-16. 被引量:646
  • 7胡振中,张建平,张新.基于四维时空模型的施工现场物理碰撞检测[J].清华大学学报(自然科学版),2010,50(6):820-825. 被引量:27

二级参考文献19

  • 1张昆.基于BIM应用的软件集成研究[J].土木建筑工程信息技术,2011,3(1):37-42. 被引量:28
  • 2过俊.BIM在国内建筑全生命周期的典型应用[J].建筑技艺,2011(1):95-99. 被引量:141
  • 3杜训,陆惠民.建筑企业施工现场管理[M].北京:中国建筑工业出版社,1996.
  • 4YEH I- Cheng. Construction site layout using annealed neural network [J]. J Comput Civil Eng, 1995, 9(3): 201 -208.
  • 5Elbeltagi E, Hegazy T. A-hybrid AL based system for site layout planning in construction [J]. Comput Aided Civil Info, 2001, 16(2): 79-93.
  • 6Lam K C, Tang C M, Lee W C. Application of the entropy technique and genetic algorithms to construction layout planning of medium-size projects [J]. Constr Manage Econ, 2005, 23(2): 127-145.
  • 7Tantisevi K, Akinci B. Transformation of a 4D product and process model to generate motion of mobile cranes [J]. Automat Constr, 2009(18):458-468.
  • 8张建平,郭杰,吴大鹏,等.基于网络的建筑工程4D施工管理系统[C]//第十三届全国工程建设计算机应用学术会议论文集.广东,佛山,2006:495-500.
  • 9边美玲,任建平.包围盒碰撞检测技术的研究[J].机械管理开发,2008,23(2):27-28. 被引量:15
  • 10张建平,胡振中.基于4D技术的施工期建筑结构安全分析研究[J].工程力学,2008,25(A02):204-212. 被引量:24

共引文献671

同被引文献310

引证文献28

二级引证文献303

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部