特高压交流单相接地故障过电压计算及限制方法 被引量:4

Calculation and suppression of single-phase grounding overvoltage in UHVAC system
下载PDF
导出
摘要 基于系统电源阻抗特性对单相接地故障过电压的影响规律,提出了综合考虑该过电压的各影响因素后求取单相接地故障过电压最大值的方法,利用该方法可以在较少的仿真计算量下准确地求出单相接地故障过电压最大值。对不同长度线路的单相接地故障过电压的限制问题进行了探讨,并从综合考虑工频过电压和操作过电压的角度提出了沿线高抗补偿容量的最优分配方案,最后对单回线路与双回线路的单相接地故障过电压进行了比较,提出了相应的过电压限制措施。结果表明线路长度小于500 km时,采用线路两端设置高抗和金属氧化物避雷器(MOA)的措施,即可有效限制该过电压;当长度超过600 km时,需在长线路中间进行分段落点,设置MOA及合适的高抗补偿容量来限制该过电压,分段距离宜控制在400 km左右;相同长度下,单回线路的单相接地故障过电压较双回线路严重。 Based on the effect of power source impedance on single-phase grounding overvohage,a method to accurately calculate the maximum single-phase grounding overvoltage with less simulative computation is proposed,which considers various influencing factors synthetically. The suppression of single-phase grounding overvoltage is studied for different line lengths and the optimal allocation of HV(High Voltage) shunt reactor compensation capacity along line is proposed from the aspect of both frequency overvoltage and switching overvoltage. The single-phase grounding overvoltage is compared between single-loop and dual-loop lines, which shows that of former is serious than that of latter,and the corresponding countermeasures are given: MOA(Metal Oxide Arrester) and HV shunt reactor should be installed at both ends for line with length less than 500 km;distributed MOA and HV shunt reactor installed for each segment of line with length greater than 600 km,the length of line segment should be about 400 km.
出处 《电力自动化设备》 EI CSCD 北大核心 2014年第8期147-154,共8页 Electric Power Automation Equipment
基金 国家重点基础研究发展计划(973计划)资助项目(2011-CB209405)~~
关键词 特高压输电 交流特高压 过电压 接地 故障分析 阻抗特性 线路分段 计算 UHV power transmission UHVAC overvoltage electric grounding failure analysis impedance characteristic line segment calculations
  • 相关文献

参考文献20

  • 1孙才新,司马文霞,赵杰,饶宏,张弥.特高压输电系统的过电压问题[J].电力自动化设备,2005,25(9):5-9. 被引量:70
  • 2电力工业部电力科学研究院高压研究所.DL/T620-1997交流电气装置的过电压保护和绝缘配合[S].北京:中国电力出版社.1997.
  • 3水利电力总电力科学研究院高压研究所.SD119-84500kV电网过电压保护绝缘配合与电气设备接地暂行技术标准[S].北京:中国电力出版社,1984.
  • 4李杨,沈扬,周浩,计荣荣,孙可,丁健,钱锋.长距离特高压交流输电线路单相接地故障过电压研究[J].电力自动化设备,2013,33(12):98-104. 被引量:7
  • 5国家电网公司.国网电力科学研究院,中国电力科学研究院.GB/Z24842-20091000kV特高压输变电工程过电压及绝缘配合[S].北京:中国标准出版社,2009.
  • 6邢海瀛,陈柏超,张亚迪,田翠华,袁佳歆.快速响应磁控电抗器抑制特高压操作过电压研究[J].电力自动化设备,2009,29(1):15-18. 被引量:10
  • 7HUANG Daochun,RUAN Jiangjun,YU Shifeng. Overview of the recent developments of ultra high voltage AC transmission in China[C]//JPower and Energy Society General Meeting-Conversion and Delivery of Electrical Energy in the 21st Century. Pittsburgh, USA : iEEE, 2008 : 1-9.
  • 8LINGS R,CHARTIER V,MARUVADA S. Overview of transmission lines above 700 kV [C]//Power Engineering Society Inaugural Conference and Exposition in Africa. Durban,South Africa: IEEE ,2005 : 33-43.
  • 9FAKHERI A J,BHATY N B,WARE B J,et al. Analysis and control of transient over-voltages on UHV transmission systems [J]. IEEE PAS. 1983.102(10) :3315-3328.
  • 10谷定燮,周沛洪,戴敏,修木洪,何慧雯.中日特高压输电系统过电压和绝缘配合的比较分析[J].高电压技术,2009,35(6):1248-1253. 被引量:25

二级参考文献101

共引文献284

同被引文献53

  • 1许伟,陈水明,何金良.1000kV交流输电线路的故障激发过电压研究[J].电网技术,2005,29(21):14-17. 被引量:23
  • 2吴笃贵,贺春,易永辉.一种新颖的频率跟踪算法[J].电网技术,2004,28(14):39-43. 被引量:31
  • 3何欣,王建文,韩伟.氧化锌压敏电阻器工频过电压耐受性能与限制电压关系的研究[J].电瓷避雷器,2005(2):44-46. 被引量:7
  • 4蒋卫平,朱艺颖,吴娅妮,曾昭华,班连庚,解秀余.750kV输变电示范工程操作暂态过电压现场实测与计算分析[J].电网技术,2006,30(15):8-13. 被引量:20
  • 5中国南方电网公司.交直流电力系统仿真技术[M].北京:中国电力出版社.2007.
  • 6中国南方电网有限责任公司.中国南方电网二Ο一四年运行方式[R].广州:中国南方电网有限责任公司,2013.
  • 7GUO Q,HAN W Q,RAO H,et al. Study on the reliability of real-time simulation[C] JjThe Third International Conference on Electric Utility Deregulation and Restructuring and Power Techno- logies. Nanjing, China: ~s.n. ] ,2008 : 1708-1711.
  • 8南方电网科学研究院.南方电网2013年典型方式数据220kV及以上系统RTDS实时仿真平台仿真建模研究报告[R].广州:南方电网科学研究院.2013.
  • 9黄立滨.蔡海青.李书勇.等.楚穗直流孤岛运行交流保护对频率适应性的RTDS仿真试验[R].广州:南方电网科学研究院.2013.
  • 10中国南方电网有限责任公司电网技术研究中心.楚穗直流孤岛运行专题分析报告[R].广州:中国南方电网有限责任公司电网技术研究中心.2010.

引证文献4

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部