期刊文献+

300 MW机组甩负荷试验超速原因分析与处理 被引量:2

Analysis on the Causes of Over-speed and Treatment for Load Rejection Test of 300 MW Unit
下载PDF
导出
摘要 火电厂汽轮机甩负荷试验的目的是考核汽轮机调节系统动态特性,评定调节系统的动态品质。根据某电厂300MW亚临界机组DEH控制逻辑的特点,针对两次50%甩负荷试验汽机超速现象,通过分析甩负荷试验动态过程和相关试验数据,得出OPC电磁阀没有动作是汽轮机超速的根本原因。最后用50%和100%成功甩负荷试验数据证实该机组的调节系统动态特性优良,对同类型机组甩负荷试验具有重要的借鉴和指导意义。 The purpose of load rejection test of the turbine in thermal power plant is to assess the dynamic characteristic and the dy- namic quality of the turbine regulator system. Based on the characteristics of the DEH control logic of 300 MW subcritieal units and the over-speed phenomenon of the turbine in two 50% load rejeetion tests, it reveals that OPC solenoid valve no action is the root cause of the steam turbine over-speed by analyzing the dynamic processes and related data of load rejection tests. At last, the analytical data in 50% and 100% successful load rejection tests confirmed that the dynamic characteristic of the regulation system of the unit is excel- kent. And the study of this paper could provide significant to some extent for the load rejection tests of the units of the same type.
出处 《东北电力技术》 2014年第5期21-23,26,共4页 Northeast Electric Power Technology
关键词 甩负荷 超速 控制逻辑 OPC 控制策略 Load rejection Over-speed Control logic OPC Control strategy.
  • 相关文献

参考文献7

二级参考文献15

共引文献42

同被引文献16

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部