4MALISZEWSKI R M, PASTERNACK B M. A statistical technique for projecting future short-circuits level of EHV system. CIGRE Symposium, 1995, 100(8).
5电力行业电网运行与控制标准化技术委员会.电力系统安全稳定导则.北京:中国电力出版社,2001.
6HONGESOMBUT K, MITANI Y, TSUJJ K. Optimal location assignment and design of superconducting fault current limiters applied to loop power systems. IEEE Trans on Applied Superconductivity, 2003, 13(2) : 1828-1831.
7SARMIENTO H G, CASTELLANOS R, PAMPIN G, et al. An example in controlling short circuit levels in a large metropolitan area// Proceedings of 2003 Power Engineering Society General Meeting, July 13-17, 2003, Toronto, Canada: 589-594.
8SAATY T L. Decision making with dependence and feedback: the analytic network process. Pittsburgh, PA, USA: RWS Publication, 1996.
9YU R, TZENG G H. A soft computing method for multicriteria decision making with dependence and feedback. Applied Mathematics and Computation, 2006, 180(1): 63-75.
10STEFOPOULOS G K, YANG F, COKKINIDES G J, et al. Advanced contingency selection methodology// Proceedings of the 37th Annual North American Power Symposium, October 23-25, 2005, Ames, IA, USA:67 73.