填方路堤工程要尽可能采用机械化施工,保证质量,加快施工进度。特别是路基土方的压实,必须要采用机械进行工作,否则压实度难以达到规范的要求。
Fill embankment construction project to maximize the use of mechanization, quality assurance, accelerate the construction schedule. Especially compacted subgrade earthwork must be mechanical work, otherwise difficult to achieve the degree of compaction specifications.
出处
《科技与创新》
2014年第12期66-67,共2页
Science and Technology & Innovation
关键词
基底
填料
路堤
压实机械
base
filler
embankment
compacting machinery